(WO) – Australia’s offshore regulator, NOPSEMA, has accepted Chevron Australia’s atmosphere plan (EP) for drilling on the Geryon and Eurytion fuel fields. The plan covers six new subsea manufacturing wells clustered round a single drilling middle.
Geryon and Eurytion, often known as Gorgon Stage 3, are the primary of seven backfill fields Chevron plans to develop to produce the Gorgon fuel improvement. The opposite 5 are Chandon, Chrysaor, Dionysus, Semele and West Tryal Rocks. Chevron awarded the main subsea contract for the stage to TechnipFMC final December. Subsea7 received the set up work the identical month.
The fields lie within the Northern Carnarvon Basin, about 80 km (50 mi) from the Montebello Islands and about 184 km (114 mi) from Onslow on the mainland. The wells might be in retention lease WA-22-R, in about 1,221 m (4,006 ft) of water.
In line with the EP, drilling and completions are scheduled to start out in early 2027 and take an estimated 12 to 18 months, in a number of campaigns. Chevron cautioned that the timing might shift with rig, vessel, infrastructure or tools availability, regulatory approvals and climate. Due to that, the work might happen at any level through the plan’s five-year in-force interval.


