The contract covers BHEL’s duties for design, engineering, manufacturing, present, erection, commissioning, and civil works, in accordance with a company assertion.
The order pertains to the 800 MW Adilabad supercritical thermal power mission in Mancherial district, Telangana, and shall be executed on an EPC (Engineering, Procurement & Constructing) basis.
All the price of the order is Rs 6,700 crore, excluding taxes and duties.
The model new unit shall be constructed subsequent to the prevailing 2×600 MW objects, which had been moreover entrusted to BHEL for Boiler-Turbine-Generator (BTG) work and commissioned in 2016.
BHEL has effectively put in over 75% of the coal-based power items for diverse utilities in Telangana.As India’s important power instruments producer, with over 1,70,000 MW of put in power functionality all through the nation, BHEL continues to play an vital perform in strengthening India’s vitality security and advancing the nation’s intention of self-reliance throughout the power sector.Shares of the company fell 14.41% and underperformed its sector by 128.11% to this point 12 months. Within the meantime, the scrip provided 250.83% returns throughout the last three years. Consistent with Trendlyne, the stock has worse 1 12 months returns than commerce, sector, Sensex and Nifty50
Supply hyperlink